
Aftermath Silver CEO Ralph Rushton joined Steve Darling from Proactive to discuss additional assay results from the company’s Phase 3 diamond drill program at the Berenguela silver-copper-manganese deposit in southern Peru, as the project advances toward pre-feasibility. Rushton said the latest results cover the final 15 holes from a 90-hole, 15,540-metre diamond drilling campaign completed across three phases. These most recent holes were focused on infill drilling along a 100-metre strike length within the existing resource area, with the objective of defining high-grade mineralization suitable for a potential starter pit and improving mine planning confidence for future operations. The infill drilling program around the proposed starter pit areas is now complete, and management expects the results to play an important role in metallurgical testwork, mine scheduling, and the ongoing pre-feasibility study. Rushton noted that drilling in Domain 2, near a small historic open pit,...
Loading summary