
Standard Uranium CEO Jon Bey joined Steve Darling from Proactive to provide an update on the company’s exploration strategy, highlighting final-stage planning for its 2026 drill program at the Davidson River Project, alongside promising early results from the Rocas Uranium Project. At Davidson River, the company is preparing to drill across the Warrior, Bronco, and Thunderbird conductor corridors, targeting basement-hosted, high-grade uranium mineralization. These targets lie along the same regional structural trends that host some of the Athabasca Basin’s most significant discoveries, including Arrow Deposit, operated by NexGen Energy Ltd., and the Triple R Deposit, operated by Paladin Energy Ltd.. Bey explained that the upcoming drill campaign will utilize two rigs operating simultaneously, a strategy designed to maximize drilling metres and accelerate the evaluation of what the company considers its highest-confidence targets identified to date on the property. These targets ...